Skip to content
English
  • There are no suggestions because the search field is empty.

How to Set the Starting Date for a Logistic Agent in Shoreline Design

Summary: This article outlines the steps to set the starting date for a logistic agent using available options within the system.

Options for Setting the Starting Date

  1. Using Lead Time:

    • Navigate to your simulation case.
    • Open the Build tab and select Logistics.
    • Add or edit your logistic agent.
    • Set the Lead time or Logistics lead time in the appropriate section. This setting will determine when the logistic agent becomes available for tasks.
  2. Creating Availability Periods:

    • In the Logistics tab, select your logistic agent in the Member list.
    • Add a availability period with your desired start and end dates that can repeat every year to prevent operations outside of these dates.
    • Alternatively add periodic periods of availability with days on and days off to prevent operations in the off period.

Conclusion

By adjusting the lead time or creating time restrictions, you can effectively manage the starting date for your logistic agent. If you need further assistance or detailed steps for a specific vessel type, please reach out for more help.