Troubleshooting Simulation Scheduling Failures

How should simulation scheduling be configured?

Keep scheduling in the Strategy tab to one or two scheduling times, with a wide gap between them. Using five scheduling times can cause repeated rescheduling during the simulation — particularly in complex scenarios with many turbines — leading to instability and simulation failure.

What happens when too many scheduling times are configured?

When multiple scheduling slots are configured, tasks may be rescheduled at each new time slot before technicians have arrived on-site. This can create a loop that interrupts the simulation and may cause it to fail.

What is the recommended setup?

Use one or two scheduling times rather than five, especially for more complex scenarios. A wider spacing between scheduling times can help keep the simulation stable.

What to check if the simulation still fails

  1. Review the scheduling strategy defined in the Strategy tab.
  2. Reduce the number of scheduling times.
  3. Use a wider gap between the remaining scheduling times.
  4. If the issue persists, share the project with the support team and grant write access so the scenario can be copied and reviewed directly.

When is multiple scheduling still acceptable?

Multiple scheduling slots may be suitable for simpler scenarios. In more complex cases — particularly those with many turbines — one or two scheduling times is the recommended configuration.