Work Order Import with Plan Association

 Import work orders from a CSV file

You can create or update multiple work orders at once by importing a CSV file. This is useful for bulk-creating work orders from an external system or associating a set of work orders with a specific work package (plan).


Before you start
  • You need the Import work orders permission.
  • Your file must be in CSV format (.csv). Excel files are not supported.
  • Mandatory columns are: Site ID, Work order type, Name, and Priority.
  • All other columns are optional.

Step 1: Configure field mappings

Field mappings tell Shoreline which column in your CSV corresponds to which work order field. You only need to configure this once — mappings are saved for future imports.

  1. Navigate to Import > Work orders.
  2. In the Field mappings section, review the list of available fields. Each row shows:
    • The Shoreline field name on the left
    • An editable text box in the middle — enter the exact column header from your CSV
    • A mapping type on the right (One-to-one, One-to-multiple, or Fixed value)
  3. Fields marked with * are mandatory and must be mapped.
  4. Click Save to store your mappings, or Use default field names to reset to defaults.

Two additional options appear at the bottom of the mapping section:

  • Ignore empty cells — if a cell is blank, the existing value on the work order is preserved (rather than overwritten with blank).
  • Ignore missing columns — if a mapped column is absent from the CSV entirely, the existing value is preserved.

Step 2: Prepare your CSV

Your CSV file must include at minimum the four mandatory columns. A header row is required.

Mandatory columns

 

Column

Description

Site ID

The external ID of the site the work order belongs to

Work order type

The name of the work order type

Name

The work order name

Priority

The work order priority

 

Optional columns (selection)

 

Column

Description

Work order ID

External ID for the work order (used to update existing records)

Asset ID

External ID of the asset

Subassembly ID

External ID of the subassembly

Component ID

External ID of the component

Work package

Name or external ID of the work package (plan) to associate the work order with

Planned start / finish date

Planned dates

Kanban status

Kanban status name

Estimated man-hours

Numeric value

Required skills

Pipe-delimited list (e.g. GWO BST\|First Aid)

Checklist templates

Pipe-delimited list of template names

Bill of Materials

Pipe-delimited list in format InventoryName:Quantity

Organization

Organisation name

 

Accepted date formats: DD/MM/YYYY, DD.MM.YYYY, D/M/YYYY, D.M.YYYY, YYYY-MM-DD


Step 3: Associate work orders with a work package

To link imported work orders to a work package (plan), include a Work package column in your CSV and enter the work package's name or external ID in each row.

  • If the value matches a work package by name or external ID, the work order is linked to it automatically.
  • If no match is found, the import fails for that row with the message: "Work Package '[value]' does not exist or you don't have access to it."
  • If your company requires all work orders to have a work package, leaving this column empty will also cause a row to fail.

Step 4: Upload and import
  1. In the Upload and import section, click Choose file and select your CSV.
  2. Click Upload and import to Work order.
  3. The import runs and shows a progress summary: rows processed, created, updated, and any failures.
  4. Review any failed rows — each failure includes the row number and a description of the problem.

Common error messages
 

Error

Cause

"Importing only supports .csv files"

The file is not a CSV

"[Field] is required but not provided"

A mandatory column is blank or missing

"No site found with ID: [value]"

The Site ID does not match any site you have access to

"No order type found with name: [value]"

The work order type name does not match

"Work Package '[value]' does not exist or you don't have access to it"

Work package name/ID not found

"Work Package is missing"

Work package is required by your company settings but the column is empty

"Work Order with ID: [id] is locked and cannot be updated"

The target work order is locked

"The baseline finish date is set before the baseline start date"

Date range conflict